349 MW Limondale Solar Farm – Balranald – OTG ENERGY

Lead Surveying were engaged by a leading Electrical Civil firm to complete survey set-out of all motor post piles within the site as well as set-out all low voltage and high voltage trenches for earthworks. As the completion of electrical services were carried out, Lead Surveying completed as-constructed surveys of all underground services. 

Limondale-Solar-Farm-Cable-Asbuilts.jpg
Limondale-Trench-Setouts.jpg