Lead Surveying worked in with leading earthworks and civil contractors Ward Bros Earthmoving and Underground Constructions to assist in the delivery of the decommissioning of the No.9 channel network throughout Swan Hill and replace it with a pressurised underground pipe network.
Set-out surveys of new pipe alignments were completed along with assisting with directional drilling and service locating. As-constructed surveys of new pipeline were conducted throughout the entire project.